High temperature curing oven furnace Conveyor oven type industrial curing oven with Infrared Heating Technologies

Paint Curing Oven Powder non-stick coating curing oven Drying Oven Curing Oven Of Powder Coating machine Line

Technical Parameter

The total length is 31 meters, of which the feeding area is 2 meters, the preheating area is 10   meters (temperature is 200℃), the high temperature curing area is 10 meters (temperature is 500℃), the cooling area is 6m, the feeding area is 3 m, and the width of the furnace is 1.5m (conveying bandwidth is 1.4 m). The total height of the furnace is 450 mm (the effective height is 350 mm), and the height of the conveyor belt is 0.8m from the ground.


Heating form and power: Natural gas heating form, 200 Kcal burner in preheating zone, 400 Kcal burner in high temperature solidification zone, 7.5 kw High temperature stainless steel hot air blower, 7.5 kw conveyor belt drive motor, 6 1.5 kw industrial cooling fans installed in cooling zone, total power consumption is about 31.5 kw

Metal curing Oven for metal hardware product coating by powder non-stick machine

Ⅱ. Equipment configuration

① Insulation Layer: Made of our factory's special insulation layer, the thickness of the insulation layer in the preheating zone is 80mm, the outer layer is 1.2mm stainless steel grinding board, and the inner layer is 1.2mm stainless steel grinding board; the thickness of the insulation layer in the high-temperature solidification zone is 150mm, the outer layer s 1.2mm stainless steel grinding board, and the inner panel is made of our factory's special high-temperature fiberboard, and the insulation layer is filled with (120K) our factory's special insulation material. The heat preservation effect is excellent, the surface temperature of the furnace body is normal (±5℃), and the joint gap is slightly higher. The top of the furnace body is provided with an overhaul door for easy maintenance and cleaning of the furnace.

②Circulating ventilation system: 304 stainless steel high temperature circulating fan is used for ventilation, stainless steel plate is used for folding inside and outside the circulating air duct, and high temperature insulation material is filled in the middle. A dehumidification system is installed on the top of the furnace body. The exhaust gas and humidity are connected to the main exhaust gas pipeline and discharged outdoors through the induced draft fan.

③Conveyor system: The conveyor motor is driven by Jin fu ling 7.5 kw frequency converter, and the speed is adjustable by Source Inverter. The speed is 0-5 m/min. It is also equipped with corresponding sprockets and other transmission parts, screw tension mode.

④Line body and bracket: The main frame of the conveyor line adopts 100mm *50mm *3mm rectangular stainless-steel pipe, and the bracket adopts 50mm *50mm *3mm rectangular pipe, 1m per pipe.

⑤Conveyor belt and chain: 304 stainless steel conveyor belts, width of 1.4 meters, high temperature resistance, corrosion.resistance, durable type. The conveyor belt piercing rod adopts outer jacket inner diameter 12 mm, pipe center distance 152.4 mm, mesh hole 35x45, which ensures strength and won't be deformed under high temperature and long-term baking.

⑥Cooling fans: 6sets of 1500W industrial cooling fans, designed as detachable, independent electronic control.

⑦Electronic control box: control the start and stop of the conveyor line and the heating switch of the oven. The oven uses a temperature control meter to keep the temperature constant. It has the functions of PID temperature self-tuning and automatic constant temperature. Load control using Zhengtai contactor。

⑧Surface treatment: The surface of the wire body is made of stainless steel, except galvanized and standard parts.

2、The quotation includes design, manufacturing, materials, etc., excluding transportation and installation costs.;

3、Production time:70 working days,excluding transportation and door installation time.

4、Payment term:TT 50% in advance,after the completion of inspection and acceptance, buyer will pay 50% to start delivery. The ownership of the remaining unpaid equipment belongs to Party B.

5、Party A shall provide its own three-phase four-wire leakage switch within one meter of the machine and prepare the corresponding length of cable. Both Party A and Party B shall pay for the cost of loading and unloading.

6、After-sales service mode: free warranty for one year and life-long warranty for normal use of equipment.

Automatic powder coating system curing oven powder spraying line