facebook
13%OFF

Gas power fully automatic strawberry cleaning drying machine line vegetable fruit washing equipment with factory price-Tianfuchenglai-16-10

stars, based on 0reviews
$37500.00now$32500.00 unit
0items available
Contact Us
Description

Gas power fully automatic strawberry cleaning drying machine line vegetable fruit washing equipment

This machine is widely used for vegetables and fruits, food, beverages, condiments, dairy, pharmaceutical and other industries.

It is also used for drying small packaging bags of meat products, vegetable products after sterilization, also plastic trays or crates.

The main technical parameters and the relevant conditions and instructions:


Process section configuration:

1. The first feeding section:

1. The entire process section made of stainless steel, length 1000 mm × width 300 mm × height 1200 mm.

2. The fat section at the second ultrasonic wave:

1. The entire process section is made of stainless steel, with a length of 5000 mm × a width of 1200 mm × a height of 300 mm.

2. 1 set of all stainless steel with groove, length 600mm×width 800mm×height 800mm.

3. One 0.75KW stainless steel water pump.

4. One Φ200mm×700mm stainless steel filter.

5. 10 Φ32mm double-clamp plastic nozzles.

6. Heating system: 380V stainless steel heating tube 3×9KW=27KW.

7. Two high-bottom water level protections.

8. Drainage: 2 1½" stainless steel ball valves.

9. Water inlet: 1 stainless steel ball valve with 6 points.

10. Ultrasonic system:

10.1  Vibration plate size: 1200×500mm×100mm.

10.2  28KHZ 2.4kw ultrasonic vibration plate 4 sets.

10.3  4 sets of 28KHZ 2.4kw ultrasonic control boxes.

3. The third high-pressure spray cleaning machine section:

1. The entire process section is made of stainless steel, L1500 mm×W1200 mm×H300 mm.

2. All stainless steel with groove, 1 setlength 800mm×width 1800mm×height 250mm.

3. 2.2KW vertical stainless steel water pump, 1 set.

4. Φ200mm×700mm stainless steel filter, 1piece.

5. Φ32mm double clip plastic nozzle, 60 pieces.

6. High and bottom water level protection, 2 pieces for each.

7. Drainage: 1½" stainless steel ball valve, 1piece.

8. Water inlet: 6-point stainless steel ball valve,1piece.

4. The fourth high-pressure spray cleaning section:

1. The entire process section is made of stainless steel, H1500 mm×W1200 mm×H 300 mm.

2. 1 set of all stainless steel with groove, length 800mm×width 1800mm×height 250mm.

3. 2.2KW vertical stainless steel water pump, 1 set.

4. Φ200mm×700mm stainless steel filter, 1 piece.

5. Φ32mm double clip plastic nozzle, 60 pieces.

6. High and bottom water level protection, 2 pieces for each.

7. Drainage: 1½" stainless steel ball valve,1 piece.

8. Water inlet: 6-point stainless steel ball valve, 1 piece.

5. The fifth high-pressure spray cleaning section:

1. The entire process section is made of stainless steel, L1500 mm×W1200 mm×H300 mm.

2. All stainless steel with groove, 1 set, L800mm×W1800mm×H250mm.

3. 2.2KW vertical stainless steel water pump, 1 set.

4. Φ200mm×700mm stainless steel filter, 1 piece.

5. Φ32mm double clip plastic nozzle, 60 pieces.

6. High and bottom water level protection, 2 pieces for each.

7. Drainage: 1½" stainless steel ball valve, 1 piece.

8. Water inlet: 6-point stainless steel ball valve, 1 piece.

6. The sixth high-pressure wind cutting water section:

1. The entire process section is made of all stainless steel, L500 mm×W1200 mm×H300 mm.

2. High-pressure air system: 380V, 7.5KW high-pressure fan, 1 set.

3. Φ76×1200mm stainless steel air knife, 1 set.

 

7. The seventh high temperature drying section:

1. The overall dimensions of the drying oven: L5000 mm×W1400 mm×H600 mm.

2. The size of the inner cage of the drying furnace:L6000 mm×W1200 mm×H300 mm.

3. Peripheral material of the drying furnace: 70mm thick silicate rock wool insulation board.

4. The inner material of the drying furnace: 1.0mm thick stainless steel plate.

5. Heating system: stainless steel heating tube 2KW=24pcs

6. Hot air circulation system: 2.2KW centrifugal circulation fan, 2 sets.     

8. Workpiece cooling + blanking section:

1. Cooling section size: L1500 mm×W1200 mm×H300 mm.

2. One 0.75KW negative pressure cooling fan.   

Equipment operation steps and methods:

1. Turn on the main switch on the panel to check whether the three-phase power indicator is normally turned on; if any of them are not activated:

1.1. First check whether the main power supply lacks phase.

1.2. Whether the indicator light is burned out. Corresponding treatment or maintenance shall be carried out according to the actual situation after inspection.

2. About 10 seconds after turning on the power, the touch screen displays normally, and all the switches are correspondingly clicked:

For example: heating, ultrasonic, circulating fan, high pressure fan, circulating water pump, spraying, transmission switch.

3. The whole machine is equipped with two emergency stop switches, one is on the main electrical box of the equipment, and the other is at the position of the unloading port; the whole machine will stop working when the machine is pressed in an emergency situation during the operation of the equipment.

4. The discharge port of the equipment is equipped with a set of photoelectric switches for workpiece inspection. When the workpiece passes through the various processes and reaches the discharge port, no one will take the workpiece away. After the photoelectric switch is checked, it will automatically stop the operation of the mesh belt.

Equipment maintenance items:

1. chains, gears, bearings once every three months to fight butter.

 

2. Conveying motors, circulating water pumps, high-pressure fans, electric box cooling air conditioners, circulating fans, etc., use air guns to clean up dust every 15 days.

 

3. Before the filter is turned on, take out the filter bag and rinse it with clean water once every day; replace the filter bag once every three weeks.

 

4. All water (attached) tanks are changed once every two weeks, and the water (attached) tanks are rinsed with clean water, and then clean water, cleaning agent, and rust inhibitor are added.

Equipment troubleshooting method:   

4.1. Troubleshooting method of the water tank heating system (please check whether the water level is insufficient on the touch screen before doing the following inspections):

1. When the water temperature is not heated to the set temperature within the corresponding time after the heating switch is activated, please check whether the heating tube is burned out, and if the heating tube is burned out, please replace the accessories of the same type in time.

 

2. If the heating tube is not burned out, please refer to the equipment circuit drawing to check whether the corresponding electrical accessories and wiring are burned out. If they are burned out, please replace the electrical parts of the same model.

 

4.2. The troubleshooting method of the high-pressure spray filter system (please check whether the water level is insufficient on the touch screen before doing the following inspections):

1. When the filter switch is activated, the filter water pump does not start, please refer to the equipment circuit drawing to check whether all electrical accessories are burnt out or have trip protection. If they are burnt out, please replace them in time. If the protection is disconnected, please reset them manually.

 

2.If the liquid in the cleaning tank cannot be recycled after 1 condition is met, check whether the filter bag is clogged, and if it is clogged, please replace the filter bag in time.

 

4. If the liquid cannot be circulated after the conditions 1 and 2 are met, please check whether the pipeline is blocked and whether the ball valve is in the normally open state.

 

4.3. The troubleshooting method of the high pressure wind cutting water system:

1. When the high-pressure fan is switched on and the high-pressure fan does not start, please refer to the equipment circuit drawing to check whether all electrical accessories are burnt out or trip protection. If they are burnt out, please replace them in time. If the protection is disconnected, please reset them manually.

 

2.If the high-pressure fan cannot start after all the conditions in item 1 are met, please check whether the fan is burned out. If it is burned out, please replace the high-pressure fan of the same model in time.

 

5. When the air knife does not move back and forth after the conditions 1 and 2 are met, please check whether the bearings and tracks on the air knife are stuck or damaged, whether the cylinder is damaged, and whether the electronic parts on the cylinder are normal Work; if the above situation occurs, please replace the corresponding accessories and repair in time.

Best sellers